FACTUAL ACTIVITY RECORD · An activity record based on work that took place
Fixing the production Web delivery procedure
Preventing target mix-ups through confirmed manual execution and post-delivery reachability checks
Purpose
Production Web delivery needed a fixed target and procedure that prevented unintended runs and made the result verifiable.
Implementation
The manual procedure requires a confirmation phrase, then sequences dependency installation, verification, building, delivery to one fixed public target, and a post-delivery reachability check. Preview publication paths are disabled, static assets bypass unnecessary processing, and origin authentication is limited to one secret.
The implementation shows manual confirmation, fixed-target verification, build, full rollout, and live verification in order. Repository, ref, action digests, secret names, and concrete targets are omitted.
Rendering diagram…
What was confirmed
Verification results
The delivery workflow and configuration checks were added, confirming a boundary that permits only the fixed target.
At the cutoff, the procedure had been implemented, but an actual production delivery and external reachability were not verified.
Basis for completion
The work was complete when confirmed manual delivery, the fixed target, and the sequence from verification through reachability checking were implemented.