FACTUAL ACTIVITY RECORD · An activity record based on work that took place
Applying contract-first builds to the release setup
Finalizing the dependency order from shared packages to the helper
Purpose
Beyond adding shared-contract generation, the release setup needed to adopt that order as its effective configuration.
Implementation
The workflow that builds Editorial Contracts and Local Control Contracts before compiling the helper was applied to the release configuration. The change was limited to dependency order and did not alter the application's feature boundary.
The contract-first build change is reflected in the release configuration, fixing verification order on a fresh runner. Swift checks start only after shared contracts are generated, so missing generated artifacts are not left outside the release gate.
Rendering diagram…
What was confirmed
Verification results
The integrated workflow showed both shared packages building before the helper.
Execution of a signed release remained unconfirmed at the cutoff.
Basis for completion
The work was complete when the dependency correction was applied to the release setup and ready for the next distribution check.