← All activity records

FACTUAL ACTIVITY RECORD · An activity record based on work that took place

Applying the fixed Web delivery target

Integrating one target reference across the workflow, verification, and specification

Activity period:

Purpose

The fix preventing Web delivery target mix-ups needed to be applied to the shared configuration used by publication and verification.

Implementation

The same Worker target is now reflected in the delivery workflow, verification script, and operating specification, with static checks enforcing consistency. A stale target used only by post-delivery checks can therefore be detected before execution.

The adopted cutoff state connecting deployment and verification to one target

Rendering diagram…

What was confirmed

Verification results

Delivery-contract, specification, policy, and diff checks passed.

At the cutoff, the production delivery result and public reachability were not verified.

Basis for completion

The work was complete when the shared delivery path reflected one target reference and its mismatch check.